A timely project conversation

NAPIT reported on 15 October 2026 that Amendment 4 to BS 7671 had come fully into effect following withdrawal of the previous version. Its announcement says BS 7671:2018+A4:2026 was published on 15 April and could be used immediately.

For businesses commissioning electrical work in Great Britain, this is a useful prompt to revisit the basis of a project. PULSE’s suggested starting point is a conversation with the person responsible for its electrical design: which edition applies, what decisions need reviewing, and where will those decisions be recorded?

Make the specification clear

HSE’s electrical standards guidance says specifiers are responsible for selecting and applying the standards relevant to an application, and should ensure they use the current standard. It also warns that additional standards will generally be needed for a particular application.

A proportionate management review should therefore ask the designer or contractor to identify the standards relevant to the proposed work and explain any effect on the agreed scope. Where a project is already under way, ask for a documented assessment of its position before agreeing changes. A headline alone cannot establish what an individual installation needs.

Check competence for the work

HSE’s electrical FAQs distinguish general electrical experience from specialist competence. They explain that work such as high-voltage switchgear maintenance or control-system modification is likely to require additional training and experience.

For managers, the practical question is whether the proposed people have competence relevant to the actual task. Ask how responsibilities for design, installation and inspection will be covered, and who will resolve technical questions. Record those arrangements before the work proceeds so that responsibility remains clear through to handover.

Connect handover with maintenance

HSE says electrical equipment must be maintained to prevent danger. Its maintenance guidance explains that the checks needed depend on the equipment, its environment and previous findings. Its FAQs also recommend competent inspection and testing when establishing the safety of an installation.

PULSE recommends using the project review to agree what information the business needs afterwards: the scope of completed work, relevant inspection and test documentation, outstanding actions and any implications for maintenance. Assign someone to receive that information and make it accessible to those managing the premises.

For a Cornwall workshop or another small business, a focused discussion about one planned job can be a manageable first step. The aim is to understand the decisions that affect that work and carry the resulting information into everyday management.

Check the evidence