This article is due for review. Check the linked primary guidance for changes before relying on it.
A repair with lasting consequences
HSE reported on 5 November that AJ Riley Landscapes and Building Limited had been fined £20,000, with £4,955 costs, at Warrington Magistrates' Court on 3 November 2026. The company pleaded guilty to breaching section 2(1) of the Health and Safety at Work etc. Act 1974. A worker replacing a barn skylight had fallen about ten metres on 24 February 2025 and suffered multiple fractures.
HSE's investigation identified inadequate planning and fall-prevention measures, alongside insufficient training in the controls described in the risk assessment. The case concerns failures in preparing and carrying out the work; its publication date should not be confused with the date of the incident.
Resolve the unknowns before booking the job
HSE's fragile-surfaces guidance says roofs should be regarded as fragile unless a competent person has established otherwise. It also calls for clients and contractors to agree how work on business premises will be managed, including short maintenance jobs.
PULSE's management interpretation is to make readiness a decision in its own right. A quotation and an available date leave unanswered questions about the building, the proposed task and the people making specialist judgements. Ask the person commissioning the repair to collect those questions in the job brief and identify who will resolve each one.
For a Cornwall business with a leaking store or workshop roof, that means distinguishing the request to fix the defect from authorisation to begin. Give the contractor relevant information already held about the premises, then ask for gaps to be raised while there is time to obtain competent advice. Avoid letting a provisional booking become an assumption that everything is settled.
Make the handover useful
A practical commissioning review can record who represents the premises, who manages the contractor's work and how a change in scope will be referred for a decision. These are suggested management questions, not a roof-access method or a judgement that any particular arrangement is safe.
Keep the brief, outstanding questions and decisions together so the next person involved can understand what has been agreed. If an issue remains unresolved, record the next action and its owner before authorising access. The useful outcome is a job-specific conversation with the right competent people, supported by a record that the team can use.
Sources & further reading
- HSE: Construction and landscaping company fined after worker falls through fragile barn roof Source published 5 November 2026 · Accessed 6 November 2026
- HSE: Fragile surfaces Accessed 6 November 2026
The reporting above is attributed to its source. Practical interpretation is PULSE’s. This is general information, not a site-specific assessment or safety sign-off.
No material corrections recorded. Tell us about an error, quoting this article’s title.



